FANDOM


This allows for the smelting of T4 ores by an Ore Smelter. This takes the place of Forced Induction upgrades and decreases the smelting speed of the smelter by 400%. This is the first usable method to smelt Chromium and Molybdenum Ore. This is mostly a temporary measure until a Blast Furnace can be built. It consumes about 5120 PPS while heating. Uses less ore per bar than the Blast Furnace.